Start with the last settled observation
Open the example in Pacing with Cost selected. The last observed date is March 30, 2024. The first card shows ₩1,056,908,727 for March and says that 30 days have elapsed. This is a historical example. The date on your computer is irrelevant to the calculation.
Follow the three amounts across the screen

| Display | Calculation | Result |
|---|---|---|
| Month to date | Included spend from March 1 through March 30 | ₩1,056,908,727 |
| Daily run-rate | Month to date divided by 30 elapsed calendar days | ₩35,230,291 |
| Projected month-end landing | Unrounded daily run-rate multiplied by 31 days | ₩1,092,139,018 |
The first number is observed. The last extrapolates an average over the full month. Multiplying the rounded rate displayed on screen can introduce a few won of rounding difference. Look at the daily cost chart underneath: a launch-day spike and a steady month can have the same average but very different implications for tomorrow.
Enter a cap and reconcile the final day's allowance
Set the optional cost target to 1,100,000,000. Subtract observed spend from that target. The remaining allowance is ₩43,091,273. Only March 31 remains, so that is also the remaining daily budget required to land on the target. The ₩35,230,291 run-rate describes how the month has gone so far. The ₩43,091,273 allowance describes what the approved plan would permit on the final day.
Clear the target and the linear projection still has enough information to run. The target-dependent recommendation no longer does. Before changing a platform cap, check committed campaigns, late invoices and spend already incurred on the unclosed day. Spending every remaining won is a budget choice, not an estimate of return.
Check which rows actually make up the month
If you filter the dashboard to March 24–30, the earlier March spend drops out. A card saying “Day 30 elapsed” does not establish that the file contributed thirty days of spend. Include the first day of the month and distinguish genuine zero-delivery days from missing rows. Pair a channel-filtered series with that channel's budget, not the total account budget.
Switching from cost to installs or signups changes the target's unit. Use a count for those targets. Daily revenue also has a different date basis from cumulative D7 revenue attributed to an install cohort. Substituting the latter for cash or revenue actually booked on a calendar day distorts a monthly forecast.
Use the projection in a decision
If the landing exceeds the cap, check for exceptional days or incomplete reporting before selecting a channel to trim. Compare scale and efficiency in the Segment matrix. Record the last settled date, approved target, projected landing and remaining daily allowance together. Tomorrow's reviewer can replace a single day's estimate with actual spend and see exactly why the recommendation changed.